The project includes a substantial 60,000+ cubic yards of cut and fill work to prepare the site for development. A toe key has been installed to provide structural support and stability for the site. Fine grading will follow to ensure a smooth and level surface for construction. The installation of a storm sewer system has been incorporated to effectively manage surface water runoff, ensuring proper drainage and environmental compliance throughout the development process. Stefanik assisted the wall contractor with an approximate 30ft tall keystone block wall.