Hilton Garden Inn Storm Tank
Work for Bear Construction Inc. The scope of Work included E&S Controls, building pad excavation, installation of grease interceptor and associated piping, installation of storm water retention system including excavation, fabric, stone, pipe, manholes, underdrains, and backfill. Install HDPE storm sewer ranging in size from 12” to 24”. Supply and install 6” Sanitary Sewer, taps and tie-ins within 5ft of the building. Supply and install Ductile Iron Waterline System ranging in size from 4” to 8” inclusive of fire hydrant.