Springdale Yukon Tower 154 Access

When clients require access to hard-to-reach areas, we provide the solution. The Stefanik team was called upon to provide access across a stream. Our approach involved installing a temporary 70-foot bridge strong enough to support a 140,000-pound drill rig and other heavy equipment. The project also included the installation of approximately 3,000 linear feet of Silt Sock, construction of an access road, and streambank preparation. Once the access was no longer necessary, Stefanik remobilized to remove the temporary bridge and restore both the East and West streambanks.